Costs and break-even analysis
Watch the whole lecture free
Make a free account to watch every lecture to the end: 3 practice questions, 1 real past-paper question with the answer explained and a quick quiz.
That was the teaching part. The rest of this lecture is free with an account: 3 practice questions, 1 real past-paper question with the answer explained and a quick quiz.
No password needed now: we email you a link to set one. Already have an account? Sign in, then come back to this page.
The teaching part (4 min) is free to watch. A free account opens the whole lecture: 3 practice questions, 1 real past-paper question with the answer explained and a quick quiz.
What this lecture covers
- When does a business start to profit?
- Fixed and variable costs
- Average cost
- Contribution
- The break-even calculation
- The break-even chart
- Margin of safety
- What changes break-even
- Limits of break-even
- Mistakes that lose marks
- The full-marks tip
- On one card
Read the transcript of the teaching part
Last time
Before we start: last time, in The role of marketing, markets and segmentation, you learned these points. Here they are again on one card. Keep them in mind, because today builds on them.
When does a business start to profit?
A new business sells its first products, but it is still losing money. At some point, if sales keep growing, it starts making a profit. That point is break-even. This lesson covers the types of cost, and how to find break-even by calculation and on a chart.
Fixed and variable costs
Fixed costs do not change with output: rent, insurance, salaries, and loan interest. They must be paid even if nothing is made. Variable costs change directly with output: raw materials, packaging, and piece-rate wages. Total cost is fixed costs plus variable costs.
Average cost
Average cost is total cost divided by output. A firm has fixed costs of 12,000 dollars and a variable cost of 6 dollars a unit. At 3,000 units, total cost is 12,000 plus 18,000, which is 30,000 dollars. Average cost is 30,000 divided by 3,000, which is 10 dollars. As output rises, fixed cost is spread wider, so average cost falls.
Contribution
Contribution per unit is the selling price minus the variable cost per unit. If the price is 10 dollars and the variable cost is 6, each unit contributes 4 dollars towards fixed costs. Once the fixed costs are covered, each extra contribution is profit.
The break-even calculation
Break-even output is the level of output where total revenue equals total cost: no profit and no loss. Break-even output equals fixed costs divided by contribution per unit. 12,000 dollars divided by 4 dollars is 3,000 units. Below 3,000, a loss; above it, a profit.
The break-even chart
Here the axes are output in thousands of units, and costs and revenue in thousands of dollars. Fixed cost is a flat line at 12. Total cost starts at 12 and rises by 6 a unit. Revenue starts at zero and rises by 10 a unit. They cross at 3 thousand units and 30 thousand dollars: the break-even point.
Margin of safety
The margin of safety is the amount by which actual output is above break-even output. If the firm sells 4,000 units, the margin of safety is 4,000 minus 3,000, which is 1,000 units. A bigger margin means sales could fall further before the firm makes a loss.
What changes break-even
A higher price raises contribution, so break-even output falls. Higher fixed costs, or higher variable costs, raise break-even output. So a business can test decisions: what if we raise the price, or move to cheaper premises?
Limits of break-even
It assumes every unit made is sold, which may not happen. It assumes the price and the variable cost per unit stay the same, though bulk buying and discounts change them. And fixed costs can change, such as a rent rise. So use it as a guide, not a certainty.
Mistakes that lose marks
Mistake one: dividing fixed costs by the price, not by the contribution. Mistake two: giving break-even in dollars when units are asked, or forgetting units. Mistake three: in a choose-a-product question, calculating but not using the numbers to decide. The fix: show the formula, the working, the units, and use the answer.
The full-marks tip
The full-marks tip: show the formula, the working and the units: fixed costs divided by contribution per unit. In a choice question, compare break-even and margin of safety for each option, then decide.
On one card
So, on one card: costs and break-even. Keep it for revision.
How often it comes up
How often Cambridge has asked each part, counted by ExamYard from every past paper in its question bank: Break-even analysis · Costs: fixed, variable, total, average · Break-even analysis.
The whole chapter: Operations Management, Operations Management.
Chapter 4: Operations management
- Methods of production, efficiency and lean production 4 min
- Costs and break-even analysis 4 min
- Economies of scale and quality 4 min
- Location decisions and sustainable production 4 min
Also for O Level Business 7081
Which topics come up most in O Level Business 7081 past papers, counted from every paper since 2004: O Level 7081 topic frequency, IGCSE 0264 topic frequency.
The topical past-paper books: O Level 7081, IGCSE 0264.